Re-architecture Priority Items Follow-up

Hi all,

Ashraf, Gaurav, and Lakshmi - Thank you for your thoughtful participation and discussion today!

Renee - Please make your votes as soon as possible. I would like to pass along the priorities of the product committee off to the technical team by this Thursday.

Brian - We made additions/clarifications to a handful of end-state descriptions, which I’ve highlighted yellow. If you would like to take another look through and modify your votes in light of these changes please do so.

Brian & Renee - If the wording is unclear on any points, please reach out to me or any of the other committee members and schedule some time to discuss. I would be happy to provide more detailed descriptions based on the conversations that took place today.

Link

Google Sheets - create and edit spreadsheets online, for free.

docs.google.com

Create a new spreadsheet and edit with others at the same time – from your computer, phone or tablet. Get stuff done with or without an internet connection. Use Sheets to edit Excel files. Free from Google.

Cheers,

···

Kevin Cussen

Technology Manager

Village****Reach* ** Starting at the Last Mile*

2900 Eastlake Ave. E, Suite 230, Seattle, WA 98102, USA

CELL: 1.206.604.4209

www.villagereach.org

Connect on Facebook, Twitter** ** and our Blog